|
|
|
|
Jacques Point Seawall |
 |
Recent Projects |
|
|
|
|
Jacques Point Seawall
Construction of Rock Revetment Seawall, Carpark, Beach Shelter
|
|
|
Project Details
- Earthworks and construction of proposed unsealed car park and footpath adjacent to the existing access road
- Supply and placement of rock revetment core and armour layers, approximately 4000 Tonnes.
- Construction of rock revetment, tying in with the rocks in front of Mason’s shelter and terminating at the emergency vehicle access
- Pedestrian access from the proposed car park to the beach via a Replas staircase over the rock revetment
- 30mm red oxide asphalt disability parking space, including line marking and disability access ramp with tactile ground surface indicators
- Installation of Weldlok handrails adjacent to disability access ramp
- Installation of concrete wheel stops in car park.
- Installation of pine post and rail fencing between rock revetment and footpath.
- Reconstruction of damaged shelter. (Concrete slab, pitched roof and street furniture)
- Medium grade and tidy up of the gravel access road
- Reinstatement of the gravel emergency vehicle access to the beach (gravel resheet)
|
|
|
Key Information
Contract Period:
5 Months
Client:
The Shire of Northampton
|
|
|
|
|
|
|
|
|
|
|
|
|