Project Details
- Demolition of existing Concrete Bridge
- Over excavation and disposal of unsuitable fill, requiring dewatering.
- Construction of new reinforced concrete base slabs, wing walls and placement of RCBC
- Construction of 33m reinforced concrete floodway over the culverts
- Rock pitching around the inlets and outlets of the culverts
- Side track construction
- Creek dewatering
- Tree removal, clearing and grubbing
- Traffic management over side track
- Liaising with local farmers to ensure all stakeholders were satisfied
|
|
|