Caravan Accommodation Facility
Recent Projects
Caravan Accommodation Facility
Construction of caravan accommodation facility including services
Project Details
  • Disconnection, removal and safe disposal of all existing cabling associated with services becoming redundant within the area of works.
  • Clearing, site preparation and earthworks
  • Construction of a 7m wide gravel access road
  • Construction of two sealed parking spaces as well as a disabled parking space
  • Installation of line marking for the sealed parking area
  • Construction of a 30mm asphalt crossover on Anchorage Lane
  • Construction of two unsealed parking spaces
  • Construction of 15 caravan sites with compacted gravel surface
  • Replacement of the existing access gate with 2x3m wide access gate
  • Installation of chain link fence and tie into existing fencing Construction of 0.6m high limestone block retaining walls
  • Construction of a concrete staircase from the sealed car park to the shelter footpath with handrails
  • Construction of a disability access ramp with handrail and tactile indicators Construction of concrete footpaths and staircase with handrails
  • Blue metal aggregate surface covering around the proposed transportable ablution facility
  • 100 mm heavy mulch to be placed on batter slopes and all disturbed areas on site
  • Installation of a steel framed shelter, solar shield and 2.4m high privacy screen on a concrete base slab. Shelter to match with other shelters within Kalbarri. Shop drawings to be provided for review and approval.
  • Installation of two Replas table and bench seating areas. Replas product required to match other existing picnic tables used within Kalbarri. Proposed product details to be provide for review and approval.
  • Installation of a premium barbecue, hot plate and sink, with wastewater, water and electrical supply. Proposed product details to be provided for review and approval.
  • Installation of a bin stall with a concrete floor and an external tap adjacent to the transportable ablution facility near the service parking area
  • Installation of a portable toilet dump point
Plumbing Works
  • Installation of wastewater reticulation, including reticulation to caravan sites Wastewater connection inside Lot 500 Anchorage Lane (205m in length) Installation of water reticulation, including reticulation to each caravan site.
Electrical works
  • Supply and installation of new solar bollard lighting.
  • Supply and installation of new weatherproof switched socket outlets, and its associated cabling.
  • Supply and installation of new Site Main Switchboard, Building Main Switchboard, and Distribution Board.
  • Supply and installation of new incoming submain cables. Supply and installation of new protective devices. Discrimination and grading of new protective devices. Supply and installation of new underground PVC conduits. Supply and installation of new power pits.
  • Supply and installation of new submain cables to the proposed ablution building Distribution Board. The Electrical Trade shall liaise with the supplier of the transportable ablution facility.
  • Connection of water, waste water and electrical services to the transportable ablution facility inlet and outlet points.
Key Information

Contract Period:
5 Months

Client:
The Shire of Northampton